Line-by-line supplement check
Shingles and waste, tear-off, underlayment net of ice and water, drip edge, starter, ridge cap, valleys, flashing, steep and high-roof charges, permit, haul-off and O&P.
SUPPLEMENT SOFTWARE FOR ROOFING CONTRACTORS
Upload the adjuster estimate and your EagleView, Hover, GAF QuickMeasure or Roofr report. RecountRoof checks the estimate’s roofing line items against the measurements, your shingle’s install requirements and your city’s adopted code, then drafts the supplement, the adjuster reply and the material order.
You review and send everything. No claim representation.
See it work
Upload the estimate and report, set up the job, see what the adjuster missed, send the supplement and print the material order. Sample claim shown.
A real claim
An insurance roof claim in unincorporated Arapahoe County, Colorado: CertainTeed Presidential Shake IR, a 3,277 SF roof, measured by EagleView. RecountRoof checked every roofing line against the measurements, the manufacturer’s instructions and the county’s 2021 IRC, then drafted the supplement below. Homeowner, address and claim details removed.
| Line item | Adjuster estimate | Required | Basis |
|---|---|---|---|
| Tear-off | 27.6 SQ | 32.77 SQ | EagleView roof area 3,277 SF |
| Shingles (with waste) | 28.8 SQ | 35.39 SQ | 32.77 SQ + 8% waste from the EagleView report |
| Waste factor | 3.7% | 8% | EagleView suggested waste |
| Underlayment | 15.85 SQ | 23.53 SQ | Roof area minus 924 SF of ice and water; IRC 2021 R905.1.1 |
| Drip edge | 451.24 LF | 475 LF | Eaves 280 + rakes 195; IRC 2021 R905.2.8.5 |
| Starter | 195.82 LF | 503 LF | CertainTeed Presidential double starter at eaves, SwiftStart at rakes |
| Intake vent (Lomanco Deck-Air) | Not on estimate | 36 LF | No existing intake; IRC 2021 R806.1, R806.2, R908.1 |
| Hip and ridge | 73.59 LF standard | 107 LF high-profile | Presidential Shake requires Cedar Crest or Mountain Ridge |
| Step flashing | Not on estimate | 67 LF | Measured sidewalls; IRC 2021 R905.2.8.3 |
| Headwall / counter flashing | Not on estimate | 86 LF | Measured headwalls; IRC 2021 R905.2.8.4 |
| Item | Qty | How it was figured |
|---|---|---|
| CertainTeed Presidential Shake IR shingles | 177 bundles | 32.8 SQ + 8% waste = 35.4 SQ × 5 bundles/SQ |
| Presidential starter (eaves) | 9 bundles | Eaves 280 LF + 28 LF above Deck-Air = 308 LF ÷ 36 LF/bundle |
| SwiftStart starter (rakes) | 2 bundles | Rakes 195 LF ÷ 116 LF/bundle |
| High-profile hip and ridge | 6 bundles | Ridges 77 + hips 30 = 107 LF ÷ 20 LF/bundle |
| Ice and water shield | 5 rolls | Eaves 280 LF + Deck-Air 28 LF, 3 ft wide = 924 SF ÷ 200 SF/roll |
| Synthetic underlayment | 3 rolls | 32.8 SQ − 9.2 SQ ice and water = 23.5 SQ ÷ 10 SQ/roll |
| Drip edge (eaves / rakes) | 30 + 21 pieces | 280 LF and 195 LF + 5% laps, 10 ft pieces |
| Step flashing | 2 bundles | 67 LF of sidewall ÷ ~45 LF per bundle |
| Headwall flashing | 10 pieces | 86 LF + 5% laps, 10 ft pieces |
| Lomanco Deck-Air intake | 9 pieces | 28 LF ÷ 4 ft = 7, + 1 per section for end caps |
| Coil nails / cap nails / sealant | 3 boxes / 3 buckets / 4 tubes | From roof and underlayment squares |
Every line is editable before you send it to the supply house. Pipe jacks and vents are counted from the estimate and confirmed on site.
I’m requesting a review of the estimate for the claim at the address above. The items listed below are missing or short on the current estimate. Quantities are based on the attached EagleView measurement report and job photos. The roof is being replaced with CertainTeed Presidential Shake IR shingles. The property is in unincorporated Arapahoe County, which has adopted the 2021 IRC.
Starter: short. The estimate has 195.82 LF. The required quantity is 503 LF: 280 LF of Presidential double starter at the eaves, 195 LF of SwiftStart at the rakes, and 28 LF of Presidential double starter above the Deck-Air intake vent. The CertainTeed Presidential Shake technical data sheet states: “Presidential Starter or an approved alternative starter system must be used for the two-layered starter course.”
Underlayment: short. The estimate has 15.85 SQ. The required quantity is 23.53 SQ. This is the roof area of 32.77 SQ minus 9.24 SQ of ice and water, since ice and water replaces felt where it is installed. Underlayment is required under asphalt shingles per IRC 2021 R905.1.1, as adopted by Arapahoe County (unincorporated).
Step flashing: missing. This item is not on the estimate. The required quantity is 67 LF, based on the measured roof-to-sidewall intersections. Sidewall step flashing is required per IRC 2021 R905.2.8.3, as adopted by Arapahoe County (unincorporated).
RecountRoof drafts the request; the contractor reviews every item and decides what goes to the carrier.
Three steps: upload the estimate and measurement report, check every line against measurements, manufacturer and code, then review the supplement, adjuster reply and material order.
WHAT RECOUNTROOF DOES
Every number shows its math and every requirement shows its source, so you can check it in seconds and defend it with the adjuster. RecountRoof documents the scope; it does not represent homeowners or negotiate claims.
Shingles and waste, tear-off, underlayment net of ice and water, drip edge, starter, ridge cap, valleys, flashing, steep and high-roof charges, permit, haul-off and O&P.
Pick the shingle and the check uses its starter layers, rake starter and required hip and ridge, like double starter and Cedar Crest for Presidential Shake.
Anywhere in the U.S.: RecountRoof finds the code your city or county adopted, with links to the sources, and cites it: “IRC 2024 R905.2.8.5 as adopted by Arvada.”
Type “24-inch eaves, porch 7×5 to the inside wall” and ice and water courses, porch coverage and felt are recalculated. Ask questions about the claim too.
Editable drafts written as you, with quantities and references. Paste the adjuster’s email for a point-by-point response.
Print a supply-house order with colors: bundles, starter, cap, ice and water, metals, vents and fasteners. Cash jobs skip the insurance scope: type the measurements or upload the report and print.
Findings, code references and quantities are a starting point. Contractors check them against the current adopted code, local amendments and manufacturer instructions, and decide what to send.
Pricing
No subscription and no credit card to try it. $39 a claim, or prepay a pack and pay as little as $20 a claim; prepaid claims never expire. A claim is charged once, the first time its supplement check runs; up to 10 re-runs and 25 adjuster replies on it are included.
first claim
per claim
10 claims
typed measurements
monthly, unlimited claims
Full pricing details · Large teams: contact us for monthly Enterprise pricing with unlimited claims.
CONTRACTOR INQUIRIES
Ask about RecountRoof, pricing, or a demo on one of your own claims.
This is for product inquiries only. Sending a message does not submit a claim for review, begin negotiation, or start another claim process.