For U.S. roofing contractors
From adjuster estimate to supplement, reply and material order.
RecountRoof reads the adjuster estimate and your measurement report, checks every roofing line against the measurements, the shingle manufacturer and local code, and drafts the paperwork for you to review and send.
Have these ready
What you upload
Three files per claim. PDFs work best.
- Adjuster estimate PDFXactimate or the carrier’s estimate.
- Measurement reportEagleView, Hover, GAF QuickMeasure or Roofr.
- Job photosSaved with the claim as evidence.
The workflow
Seven steps, one claim file
- 01
Create the claim and upload the estimate
Upload the adjuster estimate PDF. RecountRoof reads the claim number, carrier, insured and property address off it, so there is nothing to retype.
- 02
Add the measurement report and photos
Attach the EagleView, Hover, GAF QuickMeasure or Roofr report and your job photos. RecountRoof reads areas, pitches, eaves, rakes, ridges, hips, valleys and flashing lengths.
- 03
Set up the job
Pick the shingle you are installing and the city or county. Add field notes in plain words: eave overhang, a porch that needs full ice and water, extra items, or a question.
- 04
Run the supplement check
The roofing line items are compared with the measurements, the manufacturer’s installation requirements and the jurisdiction’s adopted IRC edition. Missing and short items are flagged with the math and the reference.
- 05
Review and send the supplement
An editable supplement request is drafted from the findings. Check it, fill in the brackets, delete anything that doesn’t apply, and send it yourself.
- 06
Answer the adjuster
Paste the adjuster’s reply. RecountRoof drafts a point-by-point response backed by the same measurements, manufacturer requirements and code.
- 07
Order the materials
Print a supply-house material order built from the same job: bundles, starter, cap, ice and water rolls, underlayment, metals, flashing and fasteners.
What’s included
Everything included with every claim
Claims, files and drafts stay private to your account.
- Line-by-line gap checkTear-off and shingles with waste, underlayment net of ice and water, drip edge, starter, hip and ridge, ice and water, valleys, step and headwall flashing, steep and high-roof charges, permit, haul-off, pipe jacks, vents and O&P.
- Manufacturer requirementsStarter layers, rake starter and required hip and ridge products for CertainTeed, GAF, Owens Corning, Malarkey, IKO, Atlas and TAMKO lines, or your own custom requirements.
- Local code by jurisdictionCode references cite the edition your city or county adopted, anywhere in the U.S.: looked up from official sources with links, and confirmed by you.
- Ice and water sized from the overhangCourses at the eaves are worked out from the eave overhang and roof pitch to reach 24 inches inside the wall, plus porches and low-slope areas from your notes.
- Supplement and adjuster repliesEditable drafts written as you, with quantities, units and references. Nothing is sent automatically.
- Printable material orderEditable quantities, supplier and delivery fields, and a clean printout for the supply house.
Findings, code references and quantities are a starting point for your review. Confirm them against the current adopted code, local amendments and the manufacturer’s current instructions before you send or order.