RecountRoof demo: how it catches missed supplement items
In about 80 seconds, see RecountRoof read an adjuster estimate and a measurement report, check each roofing line against the measurements, the shingle manufacturer’s installation requirements and local code, then draft the supplement and the material order. Sample claim shown. No sound.
What’s in the video
- Upload the adjuster estimate and the EagleView, Hover, GAF QuickMeasure or Roofr report.
- Pick the shingle line and the city or county so manufacturer rules and local code apply.
- RecountRoof compares every roofing line with the measurements and flags missing or short items.
- Review the drafted supplement request, with quantities, units and references.
- Print the supply-house material order built from the same job.
A real claim
11 items missing or short on one adjuster estimate
An insurance roof claim in unincorporated Arapahoe County, Colorado: CertainTeed Presidential Shake IR, a 3,277 SF roof, measured by EagleView. RecountRoof checked every roofing line against the measurements, the manufacturer’s instructions and the county’s 2021 IRC, then drafted the supplement below. Homeowner, address and claim details removed.
| Line item | Adjuster estimate | Required | Basis |
|---|---|---|---|
| Tear-off | 27.6 SQ | 32.77 SQ | EagleView roof area 3,277 SF |
| Shingles (with waste) | 28.8 SQ | 35.39 SQ | 32.77 SQ + 8% waste from the EagleView report |
| Waste factor | 3.7% | 8% | EagleView suggested waste |
| Underlayment | 15.85 SQ | 23.53 SQ | Roof area minus 924 SF of ice and water; IRC 2021 R905.1.1 |
| Drip edge | 451.24 LF | 475 LF | Eaves 280 + rakes 195; IRC 2021 R905.2.8.5 |
| Starter | 195.82 LF | 503 LF | CertainTeed Presidential double starter at eaves, SwiftStart at rakes |
| Intake vent (Lomanco Deck-Air) | Not on estimate | 36 LF | No existing intake; IRC 2021 R806.1, R806.2, R908.1 |
| Hip and ridge | 73.59 LF standard | 107 LF high-profile | Presidential Shake requires Cedar Crest or Mountain Ridge |
| Step flashing | Not on estimate | 67 LF | Measured sidewalls; IRC 2021 R905.2.8.3 |
| Headwall / counter flashing | Not on estimate | 86 LF | Measured headwalls; IRC 2021 R905.2.8.4 |
See the material order built from the same job
| Item | Qty | How it was figured |
|---|---|---|
| CertainTeed Presidential Shake IR shingles | 177 bundles | 32.8 SQ + 8% waste = 35.4 SQ × 5 bundles/SQ |
| Presidential starter (eaves) | 9 bundles | Eaves 280 LF + 28 LF above Deck-Air = 308 LF ÷ 36 LF/bundle |
| SwiftStart starter (rakes) | 2 bundles | Rakes 195 LF ÷ 116 LF/bundle |
| High-profile hip and ridge | 6 bundles | Ridges 77 + hips 30 = 107 LF ÷ 20 LF/bundle |
| Ice and water shield | 5 rolls | Eaves 280 LF + Deck-Air 28 LF, 3 ft wide = 924 SF ÷ 200 SF/roll |
| Synthetic underlayment | 3 rolls | 32.8 SQ − 9.2 SQ ice and water = 23.5 SQ ÷ 10 SQ/roll |
| Drip edge (eaves / rakes) | 30 + 21 pieces | 280 LF and 195 LF + 5% laps, 10 ft pieces |
| Step flashing | 2 bundles | 67 LF of sidewall ÷ ~45 LF per bundle |
| Headwall flashing | 10 pieces | 86 LF + 5% laps, 10 ft pieces |
| Lomanco Deck-Air intake | 9 pieces | 28 LF ÷ 4 ft = 7, + 1 per section for end caps |
| Coil nails / cap nails / sealant | 3 boxes / 3 buckets / 4 tubes | From roof and underlayment squares |
Every line is editable before you send it to the supply house. Pipe jacks and vents are counted from the estimate and confirmed on site.
Read the drafted supplement (excerpt)
I’m requesting a review of the estimate for the claim at the address above. The items listed below are missing or short on the current estimate. Quantities are based on the attached EagleView measurement report and job photos. The roof is being replaced with CertainTeed Presidential Shake IR shingles. The property is in unincorporated Arapahoe County, which has adopted the 2021 IRC.
Starter: short. The estimate has 195.82 LF. The required quantity is 503 LF: 280 LF of Presidential double starter at the eaves, 195 LF of SwiftStart at the rakes, and 28 LF of Presidential double starter above the Deck-Air intake vent. The CertainTeed Presidential Shake technical data sheet states: “Presidential Starter or an approved alternative starter system must be used for the two-layered starter course.”
Underlayment: short. The estimate has 15.85 SQ. The required quantity is 23.53 SQ. This is the roof area of 32.77 SQ minus 9.24 SQ of ice and water, since ice and water replaces felt where it is installed. Underlayment is required under asphalt shingles per IRC 2021 R905.1.1, as adopted by Arapahoe County (unincorporated).
Step flashing: missing. This item is not on the estimate. The required quantity is 67 LF, based on the measured roof-to-sidewall intersections. Sidewall step flashing is required per IRC 2021 R905.2.8.3, as adopted by Arapahoe County (unincorporated).
RecountRoof drafts the request; the contractor reviews every item and decides what goes to the carrier.